PERFORMANCE ENHANCEMENT OF WATER SUPPLY DISTRIBUTION IN MINNA METROPOLIS

dc.contributor.authorMNSE, MUSA MUHAMMAD,
dc.date.accessioned2017-12-13T09:47:49Z
dc.date.available2017-12-13T09:47:49Z
dc.date.issued2014-07
dc.descriptionA THESIS SUBMITTED TO THE SCHOOL OF POSTGRADUATE STUDIES, AHMADU BELLO UNIVERSITY ZARIA IN PARTIAL FULFILMENT FOR THE AWARD OF MASTER OF SCIENCE IN WATER RESOURCE AND ENVIRONMENTAL ENGINEERING DEPARTMENT OF WATER RESOURCES AND ENVIRONMENTAL ENGINEERING FACULTY OF ENGINEERING AHMADU BELLO UNIVERSITY, ZARIAen_US
dc.description.abstractIn this thesis, a diagnostic assessment of the entire water supply distribution network was carried out in order to evaluate problems associated with water supply in Minna. This assessment was carried out by conducting inventory of all the facilities in the entire water supply distribution network by onsite, physical and visual inspection of all the elements in the distribution system during operation. Qualitative assessment of equipment/facilities physical conditions and functionality was conducted using numeric rating of 0-4. The situational analysis of the system was also carried out using performance indicators such as SPEM, SERA and SWOT analyses. Detailed evaluation of overall operation and maintenance and pumping schedule plan was looked into. The results clearly shows that the transmission pipes, service reservoirs, pumping stations and valves in the distribution system are in good physical condition and are functioning properly. However, most of leakages and burst occur in asbestos pipe in the distribution system and valves in the transmission system. The system has 56% operation and 70% human resources capacity with the total evaluation capacity using SPEM as 60%. While the performance evaluation using SERAwas 39%. The type of maintenance carried out is simple reactive rehabilitation approach any time there is failure. A suggestion of proactive rehabilitation was made which is better than reactive rehabilitation approach. Thus, it will be appropriate to pump water from 0000 to 0600 hours and 1200 to 1800 hours to meet the water demand and minimised cost of operation. The sum of Nineteen Million Two Hundred and Nineteen Thousand naira (N19,219,000:00) would be required to repair the pumps and replaced the valves that are in bad condition.en_US
dc.identifier.urihttp://hdl.handle.net/123456789/9664
dc.subjectPERFORMANCE ENHANCEMENT,en_US
dc.subjectWATER SUPPLY DISTRIBUTION,en_US
dc.subjectMINNA METROPOLISen_US
dc.titlePERFORMANCE ENHANCEMENT OF WATER SUPPLY DISTRIBUTION IN MINNA METROPOLISen_US
dc.typeThesisen_US
Files
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
PERFORMANCE ENHANCEMENT OF WATER SUPPLYDISTRIBUTION IN MINNA METROPOLIS.pdf
Size:
1.29 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.62 KB
Format:
Item-specific license agreed upon to submission
Description:
Collections