A STUDY OF THE RAPID METHOD OF EARTHWORK CONSTRUCTION CONTROL

dc.contributor.authorKWOFIE, JOHN ISAAC
dc.date.accessioned2014-11-27T10:50:11Z
dc.date.available2014-11-27T10:50:11Z
dc.date.issued1991-05
dc.descriptionA thesis submitted to the Postgraduate School, Ahmadu Bello University, Zaria, Nigeria, in partial fulfillment of the requirements for the award of Master of Science degree in Civil Engineering Construction Materials. Civil Engineering Department, Ahmadu Bello University, Zaria, Nigeria.en_US
dc.description.abstractIn earthwork construction the parameter used to check the effectiveness of compaction is the Relative Compaction, a parameter which cannot be evaluated until field density tests and laboratory compaction tests on representative portions of the material have been performed. The Standard Method of arriving at this value of Relative Compaction is time - consuming because the Standard Method of performing the laboratory compaction test (to obtain the Optimum Moisture Content, OMC, and Maximum Dry Density, MDD) requires airdrying, ovendrying to determine moisture contents, and five points to plot a compaction curve- The overall effect is that the OMC and MDD will not be known until the following day. This is a shortcoming in earthwork construction where time is, indeed, money. The Rapid Method can give accurate values of OMC and MDD about an hour after digging a density hole, and hence a much faster means of assessing the effectiveness of compaction. The object of this research has been to check the accuracy of the OMC and MDD values determined by the Rapid Method. Thirty five soil samples were used, and statistical analysis carried out on the results of the OMC and MDD obtained using the two methods on each sample, indicated that the Rapid Method is not only faster, but as accurate as the Standard Method.en_US
dc.identifier.urihttp://hdl.handle.net/123456789/5684
dc.language.isoenen_US
dc.subjectSTUDY,en_US
dc.subjectRAPID,en_US
dc.subjectEARTHWORK,en_US
dc.subjectCONSTRUCTION,en_US
dc.subjectCONTROLen_US
dc.titleA STUDY OF THE RAPID METHOD OF EARTHWORK CONSTRUCTION CONTROLen_US
dc.typeThesisen_US
Files
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
JOHN ISAAC KWOFIE.pdf
Size:
7.73 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.58 KB
Format:
Item-specific license agreed upon to submission
Description:
Collections