MODELLING OF COST OVERRUNS IN BUILDING PROJECTS IN ABUJA

dc.contributor.authorBASHIR, MAMMAN
dc.date.accessioned2015-01-27T12:02:48Z
dc.date.available2015-01-27T12:02:48Z
dc.date.issued2014-06
dc.descriptionA THESIS SUBMITTED TO THE SCHOOL OF POSTGRADUATE STUDIES AHMADU BELLO UNIVERSITY, ZARIA IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE AWARD OF A MASTER DEGREE IN QUANTITY SURVEYING DEPARTMENT OF QUANTITY SURVEYING, FACULTY OF ENVIRONMENTAL DESIGN, AHMADU BELLO UNIVERSITY ZARIA NIGERIA. JUNE 2014en_US
dc.description.abstractConstruction of building projects is an endeavour that involves capital expenditure, which is either borrowed or self-financed by clients. The expected outcome of such expenditure is value for money, which is usually dictated by project objectives of cost, time and quality. Project cost, as a project objective, is a crucial determinant of project success in the prevailing economic challenges being experienced globally. Construction cost overrun has become a reoccurring phenomenon in the delivery of building projects. The major thrust of this study was to identify, analyse and model the factors that contribute to building construction cost overruns in Abuja. The study adopted a Monte-Carlo technique in simulating cost overrun using DiscoverSim® version 1.1 (SigmaXL, 2013) simulation and RiskAmp Microsoft Excel add-in software to analyse data obtained from literature review, review of project documents with contract sum of over Five Million Naira executed within Abuja city in addition to interview sessions with construction professionals. The study revealed that significant cost overruns are mainly due to re-measurement and variation. The simulation result elucidated that less than 10% of building projects are completed below the initial contract sum in Abuja which could be due to the fact that projects tend to be initiated and executed without adequate project information such as client brief, design details and specifications. The study recommends the need for minimizing occurrence of re-measurement in building projects through provision of full design information prior to contract award, development of simulation model for specific project categories and establishment of a project cost overrun band that will enable a scientific measurement of project’s value for money benchmarked against initial cost estimate.en_US
dc.identifier.urihttp://hdl.handle.net/123456789/5945
dc.language.isoenen_US
dc.subjectMODELLING,en_US
dc.subjectCOST OVERRUNS,en_US
dc.subjectBUILDING,en_US
dc.subjectPROJECTSen_US
dc.titleMODELLING OF COST OVERRUNS IN BUILDING PROJECTS IN ABUJAen_US
dc.typeThesisen_US
Files
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
MODELLING OF COST OVERRUNS IN BUILDING PROJECTS IN ABUJA.pdf
Size:
1.24 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.58 KB
Format:
Item-specific license agreed upon to submission
Description: